The below drawing represents various clips and fixings that can be used in a typical cable tunnel.
Linear heat cable fixings.
Linear heat detection cable.
Before installing firesense 2000 linear heat detection cable reference should be made to the zone layout drawings fixing arrangement drawings and the following points should be observed.
Application fixings linear heat detection general guidelines for installation of lhdc.
This can be due to either inability to sustain environmental requirements or through prohibitive costs.
Digital linear heat detection cable.
Patol supply a full range as shown over the page.
The taichung power plant is the largest coal fired power plant in taiwan and the third largest in the world.
In accordance with bs5389 pt1 2002 lhdc should be spaced no more than 5 3m away from any zone boundary or wall and no more than 10 6m between adjacent runs.
Application fixings linear heat detection cable lhdc general guidelines for installation of lhdc.
Linear heat detection clips fixings come in different variants.
Application fixings linear heat detection cable lhdc general guidelines for installation of lhdc.
Lios de tect is a robust linear heat detection system based on optical fibers.
Patol supply a full range as shown over the page.
The digital linear heat detection cable comprises of a twisted pair two core cable.
Some 24 000 metres of linear heat detection lhd cable from linesense have been supplied to provide fire protection for one of the world s most important power plants.
The cable should not be in contact with any material that will act as a heat.
Use a suitable clip for whatever you are trying to fix the cable to.
Linesense provide the following selection of fixings and clips to retain the linear heat detection lhd cable in place.
Due to the high impedance of the system all connections at zone monitors eol jb.
Linear heat detection fixings and brackets.
Lhdc should not be in contact with any material that can act as a heat sink.
The correct size and type of cable gland must be used on all junction box etc.
The correct size and type of cable gland must be used on all junction box etc.
With a range of up to 10 km and a sampling interval down to 25 cm the system is ideal for fire detection in tunnels and metros as well as large facilities like warehouses and industrial facilities.
Fixings should be placed at intervals of no more than 1 2m apart.
Each core is a tinned copper coated spring steel conductor and has special heat reactive polymer insulation.
Digital lhdc operates at fixed temperatures and is non resettable.