How to start first row of vinyl siding.
Starting with the soffit nail lengths of j channel against the inner edge of the fascia board.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Because you cut away the channels at the top of the molding you must nail directly through the molding instead of placing the nails in the designated channels that you used in the rows below.
You attach the bottom of the first row of siding to the top of this starter strip.
Cut a piece of flashing out of felt paper and install it at the bottom corners of the windows before you install the side j channels.
If the result is a whole number you re in.
Just always make sure you leave room for expansion otherwise your siding will buckle and pop.
This is where the new siding will begin.
Overlap the flashing onto the row of siding just below the window.
Now any water that runs inside the j channels will come out on top of the siding and out the weep holes designed for this purpose.
This channel conceals.
Installing vinyl siding in these 23 steps.
Divide the length of each wall by 8 inches the width of a piece of siding.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
But if the result is not a whole number you will need to cut the final piece of siding lengthwise in order to fill in.
If you have to cut the last row of siding you ll.
Installing vinyl siding is really easy.
For the remaining vinyl siding panels to be installed correct and level beginning with the lowest row you must install the starter strip correctly.
Vinyl siding starter strips.