When working in tight and cramped quarters in the attic be careful where you step.
How to fix roof trusses.
These trusses are usually engineered by a structural engineering company to carry a specific roof load.
The basics of the process are as follows.
Trusses come in different lumber widths 2 by 6 or 2 by 8.
Glue a piece of 1 rigid styrofoam to the plywood.
If the roof truss has a small crack you will be using the two wooden boards to patch it up but if the crack is much more severe you should use the steel plates because they offer much stronger support to the damaged truss.
To reinforce the ends of the trusses 3 4 inch plywood gussets were to be attached to both sides of each truss with 10d nails 3 inches on center on all chords.
When using nails to joint truss members it is also necessary to use lumber plywood or oriented strand board osb to join the members.
After measuring the damaged area between your roof trusses or rafters cut a piece of 1 2 plywood that will cover the.
For typical roof trusses used in light frame construction bolts are usually not used because of spacing requirements.
Inspect and assess the damaged section of timber and determine where it needs to be cut to prop the timber along it s length using suitably sturdy props such as acro props once supported cut off the damaged end leaving only solid un damaged timber now.
Determine the size of the roof truss to be repaired.
Driving nails into it might make it worse place.
Sometimes structural screws are also used for truss repairs.
The first thing you need to do is to assess the damage.
Fixing roof trusses to a wall plate requires a small amount of carpentry knowledge such as the abilities to read a tape measure and operate a framing square.
Cut two pieces of lumber 4.
When a truss becomes damaged cut or modified there is a chance of a structural overload or that they will not perform properly.
If a lot of trusses are damaged or one has been significantly modified or cut then consulting a engineer is wise.
To keep the plywood from cupping under the load 2x4 squash blocks were to be inserted between the top and bottom chords.